ChargingAtlas

OR / Reedsport

OR · EV charging

EV charging in Reedsport, OR

Here is what NREL's public data shows about EV charging in Reedsport, OR. As of NREL AFDC data retrieved October 2026, Reedsport has 5 public charging stations with 11 Level 2 ports, including 1 DC fast-charging port for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 5 networks: EVCS (1), Non-networked (1), FLO (1), RIVIAN_WAYPOINTS (1), and 1 more.

Connectors on record: J1772 (Level 2) at 4 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NEMA 14-50 (Level 2) at 1 station.

How Reedsport compares

Who runs Reedsport's DC fast charging

Network DC fast ports Share
EVCS 1 100%

Last verified: NREL confirmed 100% of Reedsport's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (4,299 residents; Oregon 4,272,371). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Reedsport has 5 public stations in all — see the map above.

StationNetworkChargingConfirmed
Recreation Station - Reedsport
1549 US-101 S
EVCS DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) October 2026
Creekside Crossing - 1
278 N. 16th Street
FLO 4 Level 2 · J1772 (Level 2) October 2026
451 Winchester Avenue
451 Winchester Avenue
CHARGELAB 4 Level 2 · J1772 (Level 2) October 2026
William M. Tugman State Park
William M. Tugman State Park
RIVIAN_WAYPOINTS 2 Level 2 · J1772 (Level 2) October 2026
BLM ChargePoint Charging Station
440 Fir Ave
Non-networked Charging · NEMA 14-50 (Level 2) December 2025

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Reedsport?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Reedsport

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.