OR / Sisters
OR · EV charging
EV charging in Sisters, OR
Here is what NREL's public data shows about EV charging in Sisters, OR. As of NREL AFDC data retrieved October 2026, Sisters has 9 public charging stations with 16 Level 2 ports, including 9 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 16Level 2 ports
- 9DC fast ports
- 36%Ports that are DC fast
⚡ 5 stations list free charging
Stations are operated across 7 networks: Non-networked (3), EVCS (1), Tesla Destination (1), Tesla (1), and 3 more.
Connectors on record: J1772 (Level 2) at 7 stations; NACS / Tesla at 2 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station.
Of these stations, 5 list free charging and 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.
2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Sisters compares
- 30.4 public stations per 10,000 residents — 7.8× the Oregon rate (3.9).
- 30.4 DC fast ports per 10,000 residents — 9.5× the Oregon rate (3.2).
Who runs Sisters's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 89% |
| EVCS | 1 | 11% |
Last verified: NREL confirmed 89% of Sisters's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (2,957 residents; Oregon 4,272,371). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Sisters has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Sisters, OR - Tesla Supercharger 625 North Arrowleaf Trail | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Chevron - Sisters 1001 Railway | EVCS | DC fast 1 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| Sisters Library 110 N Cedar St | Non-networked | 4 Level 2 · J1772 (Level 2) | June 2026 |
| SWTCH Energy Sisters | SWTCH | 4 Level 2 · J1772 (Level 2) | January 2026 |
| Best Western Ponderosa Lodge 500 Highway 20 | TURNONGREEN | 3 Level 2 · J1772 (Level 2) | December 2025 |
| FivePine Lodge and Spa 1021 E Desperado Trail | Non-networked | 1 Level 2 · J1772 (Level 2) | June 2025 |
| Sisters Bed and Breakfast - Tesla Destination 385 E JEFFERSON AVE | Tesla Destination | 1 Level 2 · NACS / Tesla | August 2026 |
| Oxbow Flats Apartments 950 W Felicity Lane | NOODOE | 1 Level 2 · J1772 (Level 2) | October 2026 |
| Sisters Inn & Suites 605 N Arrowleaf Trail | Non-networked | 1 Level 2 · J1772 (Level 2) | June 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Sisters?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Sisters
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.