PA / East Stroudsburg
PA · EV charging
EV charging in East Stroudsburg, PA
Here is what NREL's public data shows about EV charging in East Stroudsburg, PA. As of NREL AFDC data retrieved October 2026, East Stroudsburg has 6 public charging stations with 12 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 6Public stations
- 12Level 2 ports
- 4DC fast ports
- 25%Ports that are DC fast
Stations are operated across 3 networks: ChargePoint Network (3), Blink Network (2), Electrify America (1).
Connectors on record: J1772 (Level 2) at 5 stations; CCS (J1772 Combo) at 1 station.
How East Stroudsburg compares
- 6.4 public stations per 10,000 residents — 4.0× the Pennsylvania rate (1.6).
- 4.2 DC fast ports per 10,000 residents — 2.6× the Pennsylvania rate (1.6).
Who runs East Stroudsburg's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Electrify America | 4 | 100% |
Last verified: NREL confirmed 100% of East Stroudsburg's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (9,445 residents; Pennsylvania 13,078,751). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. East Stroudsburg has 6 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Walmart 2368 (East Stroudsburg, PA) 355 Lincoln Ave. | Electrify America | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| LVH Pocono Cancer Center 181 East Brown Street | Blink Network | 4 Level 2 · J1772 (Level 2) | October 2026 |
| SMITHFIELD EV 1-2 125 Smithfield Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| SMITHFIELD EV 3-4 125 Smithfield Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| SMITHFIELD EV 7-8 125 Smithfield Ln | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Sunoco 2583 Milford Road | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in East Stroudsburg?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near East Stroudsburg
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.