ChargingAtlas

UT / Millcreek

UT · EV charging

EV charging in Millcreek, UT

Here is what NREL's public data shows about EV charging in Millcreek, UT. As of NREL AFDC data retrieved October 2026, Millcreek has 9 public charging stations with 19 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 3 networks: ChargePoint Network (6), AMPUP (2), Electrify America (1).

Connectors on record: J1772 (Level 2) at 8 stations; CCS (J1772 Combo) at 1 station.

How Millcreek compares

Who runs Millcreek's DC fast charging

Network DC fast ports Share
Electrify America 4 100%

Last verified: NREL confirmed 78% of Millcreek's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (64,217 residents; Utah 3,503,613). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Millcreek has 9 public stations in all — see the map above.

StationNetworkChargingConfirmed
RMP UTA Olympus Cove (Millcreek, UT)
3870 S Wasatch Blvd.
Electrify America DC fast 4 DC fast · CCS (J1772 Combo) October 2026
St Marks ED
1220 E 3900 S
AMPUP 4 Level 2 · J1772 (Level 2) August 2025
St Marks East Parking Garage
1250 E 3900 S
AMPUP 4 Level 2 · J1772 (Level 2) August 2025
THE HOWICK LEFT PARKING
4101 S Howick St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
THE HOWICK RIGHT PARKING
4101 S Howick St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BASEMENTPARKING STATION ONE
1320 East Chambers Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BASEMENTPARKING STATION TWO
1324 3205 S
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BASEMENTPARKING STATION THREE
1320 East Chambers Avenue
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
BASEMENTPARKING STATION FOUR
1320 East Chambers Avenue
ChargePoint Network 1 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Millcreek?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Millcreek

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.