VA / Ashburn
VA · EV charging
EV charging in Ashburn, VA
Here is what NREL's public data shows about EV charging in Ashburn, VA. As of NREL AFDC data retrieved October 2026, Ashburn has 54 public charging stations with 110 Level 2 ports, including 72 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 54Public stations
- 110Level 2 ports
- 72DC fast ports
- 40%Ports that are DC fast
Stations are operated across 5 networks: ChargePoint Network (49), Tesla (2), Electrify America (1), MERCEDES_BENZ (1), and 1 more.
Connectors on record: J1772 (Level 2) at 51 stations; NACS / Tesla at 4 stations; CCS (J1772 Combo) at 2 stations; CHAdeMO at 1 station.
4 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Ashburn compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Ashburn doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Virginia has 2.1 public stations and 2.1 DC fast ports per 10,000 residents.
Who runs Ashburn's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Electrify America | 42 | 58% |
| Tesla | 20 | 28% |
| MERCEDES_BENZ | 10 | 14% |
Last verified: NREL confirmed 100% of Ashburn's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Ashburn has 54 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Center of Excellence Ashburn (For Testing Purpose Only) 21660 Red Rum drive | Electrify America | DC fast 42 DC fast + 1 Level 2 · CHAdeMO, J1772 (Level 2), CCS (J1772 Combo), NACS / Tesla | October 2026 |
| Ashburn, VA - Van Metre Drive - Tesla Supercharger 43101 Van Metre Dr | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| One Loudoun MB.HPC 20626 Easthampton Plaza | MERCEDES_BENZ | DC fast 10 DC fast · CCS (J1772 Combo), NACS / Tesla | October 2026 |
| Ashburn, VA - Tesla Supercharger 43300 Southern Walk Plaza | Tesla | DC fast 8 DC fast · NACS / Tesla | June 2026 |
| Aventon Moorefield 43601 Charitable Street | Blink Network | 12 Level 2 · J1772 (Level 2) | October 2026 |
| LOUDOUN METRO STATION 12 43625 Croson lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LOUDOUN METRO STATION 1 43624 Croson Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LOUDOUN METRO STATION 13 43625 Croson lame | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LOUDOUN METRO STATION 5 43625 Croson Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LOUDOUN METRO STATION 4 43625 Croson Lane | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Ashburn?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Ashburn
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.