ChargingAtlas

VT / White River Junction

VT · EV charging

EV charging in White River Junction, VT

Here is what NREL's public data shows about EV charging in White River Junction, VT. As of NREL AFDC data retrieved October 2026, White River Junction has 4 public charging stations with 16 Level 2 ports, including 8 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

⚡ 1 station lists free charging

Stations are operated across 2 networks: Non-networked (2), RED_E (2).

Connectors on record: J1772 (Level 2) at 3 stations; CCS (J1772 Combo) at 1 station.

Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.

How White River Junction compares

We only compute a per-resident rate where NREL's city name lines up with one Census city. White River Junction doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Vermont has 8.4 public stations and 5.1 DC fast ports per 10,000 residents.

Who runs White River Junction's DC fast charging

Network DC fast ports Share
RED_E 8 100%

Last verified: NREL confirmed 75% of White River Junction's stations in the 12 months before this snapshot, most recently in October 2026.

Notable charging stations

The largest sites by port count, DC fast first. White River Junction has 4 public stations in all — see the map above.

StationNetworkChargingConfirmed
Hartford NEVI Charging Center
97 S Main St
RED_E DC fast 8 DC fast · CCS (J1772 Combo) October 2026
WRJ South Main 2 Town of Hartford
97 S Main St
RED_E 12 Level 2 · J1772 (Level 2) October 2026
Key Chevrolet
32 Key Auto Dr
Non-networked 2 Level 2 · J1772 (Level 2) August 2025
White River Toyota
303 Sykes Mountain Ave
Non-networked 2 Level 2 · J1772 (Level 2) July 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in White River Junction?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near White River Junction

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.