ChargingAtlas

WA / Aberdeen

WA · EV charging

EV charging in Aberdeen, WA

Here is what NREL's public data shows about EV charging in Aberdeen, WA. As of NREL AFDC data retrieved October 2026, Aberdeen has 8 public charging stations with 12 Level 2 ports, including 26 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 7 networks: ChargePoint Network (2), Tesla (1), Electrify America (1), BP_PULSE (1), and 3 more.

Connectors on record: CCS (J1772 Combo) at 4 stations; J1772 (Level 2) at 4 stations; NACS / Tesla at 1 station; CHAdeMO at 1 station.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Aberdeen compares

Who runs Aberdeen's DC fast charging

Network DC fast ports Share
Tesla 8 31%
RIVIAN_ADVENTURE 6 23%
RED_E 4 15%
Electrify America 4 15%
BP_PULSE 4 15%

Last verified: NREL confirmed 100% of Aberdeen's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (17,044 residents; Washington 7,958,180). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Aberdeen has 8 public stations in all — see the map above.

StationNetworkChargingConfirmed
Aberdeen, WA - Tesla Supercharger
416 Wishkah Street
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Aberdeen, WA
415 West Heron Street
RIVIAN_ADVENTURE DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Harbor CDJR
711 E Wishkah ST
RED_E DC fast 4 DC fast + 2 Level 2 · J1772 (Level 2), CCS (J1772 Combo) October 2026
Walmart 2037 (Aberdeen, WA)
909 E Wishkah St
Electrify America DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo) October 2026
ARCO W Heron Street, Aberdeen, WA
705 W Heron Street
BP_PULSE DC fast 4 DC fast · CCS (J1772 Combo) October 2026
191 Constantine Way
191 Constantine Way
CHARGELAB 6 Level 2 · J1772 (Level 2) October 2026
EV CHARGER # EV CHARGER #1
1620 Edward P Smith Drive
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
EV CHARGER # EV CHARGER #2
1620 Edward P Smith Drive
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Aberdeen?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Aberdeen

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.