WI / Marshfield
WI · EV charging
EV charging in Marshfield, WI
Here is what NREL's public data shows about EV charging in Marshfield, WI. As of NREL AFDC data retrieved October 2026, Marshfield has 7 public charging stations with 16 Level 2 ports, including 1 DC fast-charging port for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 16Level 2 ports
- 1DC fast ports
- 6%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 2 networks: FLO (6), Tesla Destination (1).
Connectors on record: J1772 (Level 2) at 5 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Marshfield compares
- 3.7 public stations per 10,000 residents — 2.5× the Wisconsin rate (1.5).
- 0.5 DC fast ports per 10,000 residents — 31% of the Wisconsin rate (1.6).
Who runs Marshfield's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| FLO | 1 | 100% |
Last verified: NREL confirmed 100% of Marshfield's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (18,973 residents; Wisconsin 5,960,975). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Marshfield has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Wheelers Chevrolet GMC of Marshfield 2701 S. Maple Ave | FLO | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Hampton Inn & Suites Marshfield - Tesla Destination 400 W Upham St | Tesla Destination | 6 Level 2 · NACS / Tesla | August 2026 |
| Wildwood Park 1800 S Roddis Ave | FLO | 2 Level 2 · J1772 (Level 2) | October 2026 |
| SJ Miller Park 207 W 6th Street | FLO | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Bream Park 207 W 6th Street | FLO | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Marshfield Community center 207 W 6th Street | FLO | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Central Parking Lot 207 W 6th Street | FLO | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Marshfield?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Marshfield
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.