WI / Waukesha
WI · EV charging
EV charging in Waukesha, WI
Here is what NREL's public data shows about EV charging in Waukesha, WI. As of NREL AFDC data retrieved October 2026, Waukesha has 8 public charging stations with 2 Level 2 ports, including 19 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 8Public stations
- 2Level 2 ports
- 19DC fast ports
- 90%Ports that are DC fast
Stations are operated across 2 networks: ChargePoint Network (7), Tesla (1).
Connectors on record: CCS (J1772 Combo) at 6 stations; CHAdeMO at 4 stations; J1772 (Level 2) at 1 station; NACS / Tesla at 1 station.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Waukesha compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Waukesha doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Wisconsin has 1.5 public stations and 1.6 DC fast ports per 10,000 residents.
Who runs Waukesha's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 12 | 63% |
| ChargePoint Network | 7 | 37% |
Last verified: NREL confirmed 100% of Waukesha's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Waukesha has 8 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Waukesha, WI - Tesla Supercharger 1600 East Main Street | Tesla | DC fast 12 DC fast · NACS / Tesla | June 2026 |
| L553 EXPP PL 1 1560 East Moreland Boulevard | ChargePoint Network | DC fast 2 DC fast · CCS (J1772 Combo) | October 2026 |
| GENESIS MILWAUK GENESIS 1 1503 East Moreland Boulevard | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| GENESIS MILWAUK GENESIS 2 1503 East Moreland Boulevard | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| RUSS DARROW KIA DC FAST CHARGER 2141 East Moreland Drive | ChargePoint Network | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| BOUCHER HYUNDAI STATION 1 1537 E Moreland Blvd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| BOUCHER HYUNDAI STATION 2 1537 E Moreland Blvd | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| ELMBROOK MBOE CUST 1 2230 E Moreland Blvd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Waukesha?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Waukesha
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.