ChargingAtlas

CA / Chino Hills

CA · EV charging

EV charging in Chino Hills, CA

Here is what NREL's public data shows about EV charging in Chino Hills, CA. As of NREL AFDC data retrieved August 2026, Chino Hills has 21 public charging stations with 53 Level 2 ports, including 38 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 6 networks: ChargePoint Network (14), LOOP (3), Tesla (1), EVCS (1), and 2 more.

Connectors on record: J1772 (Level 2) at 17 stations; CCS (J1772 Combo) at 3 stations; NACS / Tesla at 2 stations; CHAdeMO at 1 station.

Of these stations, 3 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 18. Always confirm current pricing with the network before you charge.

2 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

Notable charging stations

The largest sites by port count, DC fast first. Chino Hills has 21 public stations in all — see the map above.

StationNetworkChargingConfirmed
Chino Hills, CA - Tesla Supercharger
13920 City Center Drive
Tesla DC fast 16 DC fast · NACS / Tesla June 2026
Costco Chino Hills (Chino Hills, CA)
13111 Peyton Drive
Electrify America DC fast 10 DC fast · CCS (J1772 Combo) August 2026
99 Ranch Chino Hills
2959 Chino Ave
EVCS DC fast 6 DC fast · CHAdeMO, CCS (J1772 Combo), NACS / Tesla August 2026
Dunhill - Shoppes at Chino Hills (Chino Hills, CA)
13920 City Center Dr
eVgo Network DC fast 6 DC fast · CCS (J1772 Combo) August 2026
Avalon Chino Hills
5685 Park Dr
LOOP 20 Level 2 · J1772 (Level 2) July 2026
Missions at Chino Hills
3100 Chino Hills Pkwy
LOOP 5 Level 2 · J1772 (Level 2) July 2026
Ayres Hotel Chino Hills
4785 Chino Hills Pkwy
LOOP 3 Level 2 · J1772 (Level 2) July 2026
CITY OWNED COMMUNITY CTR 2
14280 Peyton Dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
CITY OWNED CITY
13952 City Center Dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026
CITY OWNED COMMUNITY CTR 1
14280 Peyton Dr
ChargePoint Network 2 Level 2 · J1772 (Level 2) August 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Chino Hills?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Chino Hills

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved August 2026. Public stations only.