CO / Morrison
CO · EV charging
EV charging in Morrison, CO
Here is what NREL's public data shows about EV charging in Morrison, CO. As of NREL AFDC data retrieved October 2026, Morrison has 9 public charging stations with 16 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 16Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
Stations are operated across 1 network: ChargePoint Network (9).
Connectors on record: J1772 (Level 2) at 9 stations.
How Morrison compares
- 228.4 public stations per 10,000 residents — 46.6× the Colorado rate (4.9).
- 0 DC fast ports per 10,000 residents (Colorado: 2.9).
Last verified: NREL confirmed 100% of Morrison's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (394 residents; Colorado 5,957,493). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Morrison has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| CCD CHARGING. TRADING POST 2 17900 Trading Post Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CCD CHARGING. TRADING POST N 17900 Trading Post Rd | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| UPPER S LOT 1 UPPER S LOT 1 18300 West Alameda Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| UPPER S LOT 2 UPPER S LOT 2 18300 West Alameda Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CIRCLE LOT 1 CIRCLE LOT 1 18300 West Alameda Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| UPPER N LOT 1 UPPER N LOT 1 18300 West Alameda Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| UPPER N LOT 3 UPPER N LOT 3 18300 West Alameda Parkway | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| CIRCLE LOT 2 CIRCLE LOT 2 18300 West Alameda Parkway | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
| UPPER N LOT 2 UPPER N LOT 2 18300 West Alameda Parkway | ChargePoint Network | 1 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Morrison?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Morrison
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.