KY / Hebron
KY · EV charging
EV charging in Hebron, KY
Here is what NREL's public data shows about EV charging in Hebron, KY. As of NREL AFDC data retrieved October 2026, Hebron has 3 public charging stations with 14 Level 2 ports, all Level 2 (no DC fast charging on record).
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 3Public stations
- 14Level 2 ports
- 0DC fast ports
- 0%Ports that are DC fast
⚡ 1 station lists free charging
Stations are operated across 3 networks: Non-networked (1), NOODOE (1), LOOP (1).
Connectors on record: J1772 (Level 2) at 3 stations.
Of these stations, 1 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 2. Always confirm current pricing with the network before you charge.
How Hebron compares
We only compute a per-resident rate where NREL's city name lines up with one Census city. Hebron doesn't: it may be a neighborhood or unincorporated area, or a city whose stations NREL files partly under borough or neighborhood names. Statewide, Kentucky has 0.9 public stations and 1 DC fast ports per 10,000 residents.
Last verified: NREL confirmed 100% of Hebron's stations in the 12 months before this snapshot, most recently in October 2026.
Notable charging stations
The largest sites by port count, DC fast first. Hebron has 3 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Sixt Car Rental 3087 Terminal drive | NOODOE | 6 Level 2 · J1772 (Level 2) | October 2026 |
| Cincinnati Northern Kentucky International Airport 2939 Terminal Dr | Non-networked | 4 Level 2 · J1772 (Level 2) | August 2026 |
| Corporate Headquarters 3345 Point Pleasant Rd | LOOP | 4 Level 2 · J1772 (Level 2) | July 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Hebron?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Hebron
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.