ChargingAtlas

MA / Great Barrington

MA · EV charging

EV charging in Great Barrington, MA

Here is what NREL's public data shows about EV charging in Great Barrington, MA. As of NREL AFDC data retrieved October 2026, Great Barrington has 10 public charging stations with 18 Level 2 ports, including 20 DC fast-charging ports for quick top-ups.

DC fast   Level 2   not recently confirmed  ·  click a marker for details, directions & Street View

Stations are operated across 4 networks: ChargePoint Network (5), RED_E (2), QUICKCHARGE (2), Tesla (1).

Connectors on record: J1772 (Level 2) at 7 stations; CCS (J1772 Combo) at 2 stations; NACS / Tesla at 1 station.

Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 9. Always confirm current pricing with the network before you charge.

1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.

How Great Barrington compares

Who runs Great Barrington's DC fast charging

Network DC fast ports Share
RED_E 12 60%
Tesla 8 40%

Last verified: NREL confirmed 100% of Great Barrington's stations in the 12 months before this snapshot, most recently in October 2026.

Population: U.S. Census Bureau, Vintage 2024 population estimates (7,245 residents; Massachusetts 7,136,171). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.

Notable charging stations

The largest sites by port count, DC fast first. Great Barrington has 10 public stations in all — see the map above.

StationNetworkChargingConfirmed
Great Barrington, MA - Tesla Supercharger
700 Main Street Route 7
Tesla DC fast 8 DC fast · NACS / Tesla June 2026
Bard College Daniel Arts Center
84 Alford Rd
RED_E DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Goldman Group
148 Maple Ave
RED_E DC fast 6 DC fast · CCS (J1772 Combo) October 2026
Berkshire South Regional Community Center
15 Crissey Rd
QUICKCHARGE 4 Level 2 · J1772 (Level 2) November 2025
Fairfield Inn
249 Stockbridge Rd
QUICKCHARGE 4 Level 2 · J1772 (Level 2) September 2026
HOLIDAY INN GB HOLIDAY 1.3
415 Stockbridge Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HOLIDAY INN GB HOLIDAY INN 1.1
415 Stockbridge Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HOLIDAY INN GB HOLIDAY 1.2
415 Stockbridge Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
HOLIDAY INN GB HOLIDAY 1.4
415 Stockbridge Rd
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026
TGB TACONIC LOT TGB TACONIC LOT
82 Railroad St
ChargePoint Network 2 Level 2 · J1772 (Level 2) October 2026

Spotted something out of date or missing? Report a correction.

What this means

Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.

Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.

This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.

Charging at home in Great Barrington?

Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.

EV charging near Great Barrington

Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.