NY / Chittenango
NY · EV charging
EV charging in Chittenango, NY
Here is what NREL's public data shows about EV charging in Chittenango, NY. As of NREL AFDC data retrieved October 2026, Chittenango has 4 public charging stations with 8 Level 2 ports, including 4 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 4Public stations
- 8Level 2 ports
- 4DC fast ports
- 33%Ports that are DC fast
Stations are operated across 4 networks: Non-networked (1), APPLEGREEN (1), SWTCH (1), RED_E (1).
Connectors on record: J1772 (Level 2) at 3 stations; CHAdeMO at 1 station; CCS (J1772 Combo) at 1 station; NACS / Tesla at 1 station.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 3. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Chittenango compares
- 8.4 public stations per 10,000 residents — 3.0× the New York rate (2.8).
- 8.4 DC fast ports per 10,000 residents — 4.7× the New York rate (1.8).
Who runs Chittenango's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| APPLEGREEN | 4 | 100% |
Last verified: NREL confirmed 50% of Chittenango's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (4,780 residents; New York 19,867,248). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Chittenango has 4 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Chittenango Travel Plaza 2188 Tag Rd NY State Thruway | APPLEGREEN | DC fast 4 DC fast · CHAdeMO, CCS (J1772 Combo), NACS / Tesla | March 2026 |
| Chittenango Village Court 222 Genesee Street | RED_E | 4 Level 2 · J1772 (Level 2) | October 2026 |
| Green Team Lighting LLC 810 Genesee Turnpike | Non-networked | 2 Level 2 · J1772 (Level 2) | ⚠ October 2024 |
| SWTCH Energy Inc. 150 W Genesee St | SWTCH | 2 Level 2 · J1772 (Level 2) | ⚠ February 2024 |
⚠ 2 of Chittenango's 4 stations haven't been re-confirmed by NREL in over 18 months and may be out of service — confirm in the network's app. Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Chittenango?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Chittenango
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.