NY / Oneida
NY · EV charging
EV charging in Oneida, NY
Here is what NREL's public data shows about EV charging in Oneida, NY. As of NREL AFDC data retrieved October 2026, Oneida has 6 public charging stations with 19 Level 2 ports, including 18 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 6Public stations
- 19Level 2 ports
- 18DC fast ports
- 49%Ports that are DC fast
Stations are operated across 3 networks: CHARGESMART_EV (4), VIALYNK (1), EV Connect (1).
Connectors on record: J1772 (Level 2) at 6 stations; CCS (J1772 Combo) at 4 stations.
How Oneida compares
- 6 public stations per 10,000 residents — 2.1× the New York rate (2.8).
- 17.9 DC fast ports per 10,000 residents — 9.9× the New York rate (1.8).
Who runs Oneida's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| CHARGESMART_EV | 18 | 100% |
Last verified: NREL confirmed 100% of Oneida's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (10,066 residents; New York 19,867,248). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Oneida has 6 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| NYE Ford 1479 Genesee St. | CHARGESMART_EV | DC fast 6 DC fast + 6 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| NYE Chevrolet 116 Broad St. | CHARGESMART_EV | DC fast 4 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| NYE GMC 1421 Genesee St | CHARGESMART_EV | DC fast 4 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| NYE CDJR 1553 Upper Lenox Avenue | CHARGESMART_EV | DC fast 4 DC fast + 1 Level 2 · J1772 (Level 2), CCS (J1772 Combo) | October 2026 |
| Glenwood Plaza 2002 Glenwood Ave | VIALYNK | 6 Level 2 · J1772 (Level 2) | October 2026 |
| Oneida Public Library 459 Main St. | EV Connect | 4 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Oneida?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Oneida
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.