OH / Zanesville
OH · EV charging
EV charging in Zanesville, OH
Here is what NREL's public data shows about EV charging in Zanesville, OH. As of NREL AFDC data retrieved October 2026, Zanesville has 7 public charging stations with 4 Level 2 ports, including 17 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 7Public stations
- 4Level 2 ports
- 17DC fast ports
- 81%Ports that are DC fast
Stations are operated across 6 networks: FORD_CHARGE (2), ChargePoint Network (1), Non-networked (1), EV Connect (1), and 2 more.
Connectors on record: CCS (J1772 Combo) at 4 stations; J1772 (Level 2) at 2 stations; NACS / Tesla at 1 station.
Of these stations, 1 are paid, per NREL's pricing field. Pricing is not recorded for the remaining 6. Always confirm current pricing with the network before you charge.
1 station carries a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Zanesville compares
- 2.8 public stations per 10,000 residents — 1.7× the Ohio rate (1.6).
- 6.8 DC fast ports per 10,000 residents — 5.2× the Ohio rate (1.3).
Who runs Zanesville's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| Tesla | 8 | 47% |
| FCN | 4 | 24% |
| FORD_CHARGE | 4 | 24% |
| EV Connect | 1 | 6% |
Last verified: NREL confirmed 86% of Zanesville's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (24,916 residents; Ohio 11,883,304). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Zanesville has 7 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| Steak 'n Shake - Tesla Supercharger 914 Zane St | Tesla | DC fast 8 DC fast · NACS / Tesla | July 2026 |
| Best Western - Zanesville 4929 E Pike | FCN | DC fast 4 DC fast · CCS (J1772 Combo) | October 2026 |
| Dutro Ford 132 S 5th St | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | October 2026 |
| Dutro Ford 132 S 5th St | FORD_CHARGE | DC fast 2 DC fast · CCS (J1772 Combo) | October 2026 |
| JEFF DRENNEN CADILLAC OF ZANESVILLE 3625 MAPLE AVE | EV Connect | DC fast 1 DC fast · CCS (J1772 Combo) | October 2026 |
| MCLS MUSKINGUM L2 EV 220 N 5th St | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| Dutro Nissan and Ford 119 S 6th St | Non-networked | 2 Level 2 · J1772 (Level 2) | August 2025 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Zanesville?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Zanesville
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.