PA / Hawley
PA · EV charging
EV charging in Hawley, PA
Here is what NREL's public data shows about EV charging in Hawley, PA. As of NREL AFDC data retrieved October 2026, Hawley has 9 public charging stations with 12 Level 2 ports, including 3 DC fast-charging ports for quick top-ups.
DC fast Level 2 not recently confirmed · click a marker for details, directions & Street View
- 9Public stations
- 12Level 2 ports
- 3DC fast ports
- 20%Ports that are DC fast
⚡ 4 stations list free charging
Stations are operated across 3 networks: ChargePoint Network (5), Tesla Destination (3), Blink Network (1).
Connectors on record: NACS / Tesla at 3 stations; J1772 (Level 2) at 3 stations; CHAdeMO at 3 stations; CCS (J1772 Combo) at 3 stations.
Of these stations, 4 list free charging, per NREL's pricing field. Pricing is not recorded for the remaining 5. Always confirm current pricing with the network before you charge.
3 stations carry a NACS / Tesla connector — relevant if you drive a Tesla or a newer EV that has switched to NACS.
How Hawley compares
- 73.9 public stations per 10,000 residents — 46.2× the Pennsylvania rate (1.6).
- 24.6 DC fast ports per 10,000 residents — 15.4× the Pennsylvania rate (1.6).
Who runs Hawley's DC fast charging
| Network | DC fast ports | Share |
|---|---|---|
| ChargePoint Network | 3 | 100% |
Last verified: NREL confirmed 100% of Hawley's stations in the 12 months before this snapshot, most recently in October 2026.
Population: U.S. Census Bureau, Vintage 2024 population estimates (1,218 residents; Pennsylvania 13,078,751). Station counts use NREL's address city, which can extend past city limits, so rates are approximate.
Notable charging stations
The largest sites by port count, DC fast first. Hawley has 9 public stations in all — see the map above.
| Station | Network | Charging | Confirmed |
|---|---|---|---|
| LAKE REGION IGA STATION 2 52 Welwood Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| LAKE REGION IGA STATION 3 52 Welwood Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| PWH LOCATION DCFC3 149 Welwood Ave | ChargePoint Network | DC fast 1 DC fast · CHAdeMO, CCS (J1772 Combo) | October 2026 |
| Ledges Hotel - Tesla Destination 119 Falls Ave | Tesla Destination | 2 Level 2 · NACS / Tesla | August 2026 |
| The Settlers Inn, a Select Registry Property - Tesla Destination 4 Main Ave | Tesla Destination | 2 Level 2 · NACS / Tesla | August 2026 |
| Cocoon Coffee House - Tesla Destination 8 Silk Mill Dr | Tesla Destination | 2 Level 2 · NACS / Tesla | August 2026 |
| Dunkin Donuts - Hawley 2527 US-6 | Blink Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| LAKE REGION IGA STATION 1 52 Welwood Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
| PWH LOCATION DUAL HEAD 2 149 Welwood Ave | ChargePoint Network | 2 Level 2 · J1772 (Level 2) | October 2026 |
Spotted something out of date or missing? Report a correction.
What this means
Level 2 is the standard public and home charger (240V) — a few hours for a full charge, fine for shopping, work, or overnight. DC fast charging is the highway kind: 20–40 minutes to most of a charge, but not every station has it.
Connectors are the plug shape. J1772 is the universal Level 2 plug almost every non-Tesla EV uses. CCS and CHAdeMO are DC fast-charging plugs (CHAdeMO is older, mostly older Nissan Leafs). NACS is Tesla's plug, now the emerging US standard — many newer non-Teslas use it or an adapter.
This page summarizes NREL's own station records and is not a live availability map — a charger listed here can still be busy, broken, or behind a gate. Check the network's app before you rely on a specific plug.
Charging at home in Hawley?
Most EV owners do the bulk of their charging overnight at home on a Level 2 charger. See our home EV charger buying guide for what to look for and how to match a charger to your car's connector.
EV charging near Hawley
Source: U.S. DOE / NREL Alternative Fuels Data Center (AFDC) Station Locator, retrieved October 2026. Public stations only.